Anaheim Groves Improvement District- About Us
Logo-Home   Home   FAQs   Blog   Forum   About_Us   Contact_Us   


   

Main Street U.S.A.

Includes Main Street Buildings and Music Files

 
 

Home > Emporium. Shop addresses 101-105 > Modified Emporium

Most viewed - Modified Emporium
IMG_emp_1111.JPG
217 viewsBased on my experience with modifying the other pieces (mostly the Opera House-Mad Hatter-Bank piece), I decided it would be easier to construct and modify the roofs and backstage areas by removing these areas altogether with my band saw. This is the result of the band saw process.1 comments
IMG_emp_1135.JPG
211 viewsThe roof extension has been painted to blend with the pre-existing one on the sculpture.
IMG_emp_1140.JPG
206 views
IMG_emp_1113.JPG
197 viewsAfter the band saw operations, some refining and removal of material in some of the tighter corners was done with a Dremel tool. The piece is now prepared and ready for the modifications.
IMG_emp_1138.JPG
196 viewsThe main back stage walls are painted a pale green on the west side structures to help camoflage them from being viewed by guests on the nearby Jungle Cruise.
IMG_emp_1137.JPG
195 viewsThis overhead view shows the completed construction. Painting and detailing are next.
IMG_emp_1139.JPG
193 viewsThe structure with the sloping roof (actually housing the restroom facilities at the end of west Center Street) is only about 2/3rds complete because it overlaps the back stage area of the Carnation Cafe piece -which will be worked on next.
IMG_emp_1136.JPG
190 viewsTwo doors installed. These will be painted grey later.
IMG_emp_1112.JPG
184 views
IMG_emp_1132.JPG
181 views
IMG_emp_1114.JPG
178 views
IMG_emp_1124.JPG
177 views
IMG_emp_1115.JPG
174 views
IMG_emp_1116.JPG
172 viewsHere I've begun adding the new exterior walls made from .060" syrene sheet. I chose this thickness for strength (okay, I have a bunch, too).
IMG_emp_1120.JPG
172 views
IMG_emp_1130.JPG
172 viewsThere is a false roof extension (scenic blind) that I suspect was necessary to prevent guests from viewing unsightly roof details from accross Town Square when standing on the elevated portion of the rear of the Main Street train depot. It was constructed entirely of styrene pieces.
IMG_emp_1133.JPG
172 viewsThe rear of the Emporium/New Century jewelry/clock shop pieces. Notice that the Bondo 'paving' was completed before the shorter extension (to the left) was added.
IMG_emp_1118.JPG
171 viewsThe inside of the New Century jewelry/clock shop was relieved with a Dremel tool to allow a 20mm speaker to be recessed. The speaker will play the sound of the Omnibus horn when triggered from a reed switch hidden in the roadway below.
IMG_emp_1122.JPG
171 viewsAs per my photos, the center wall has a door allowing roof access.
IMG_emp_1129.JPG
171 viewsA little spot putty and sanding blends the overlay into the Olzewski sculpture.
IMG_emp_1117.JPG
170 viewsThe base of Ultra-Board has been attached to the storefronts and all the walls making up the exterior have been added. Notice I've added a strip of .060" X .250" styrene along the base of the walls for strength and also to serve as a buffer to ease with applying the Bondo putty to 'pave' the back stage area. This buffer allows me to spread the putty without having to worry about getting it on the walls or scuffing them during the sanding operation.
IMG_emp_1119.JPG
170 viewsThe main roof (from .060" styrene sheet stock) has been installed.
IMG_emp_1125.JPG
170 viewsThis is the exterior overlay (.020" styrene) that spans the rear wall between the Olszewski piece (Emporium) and the new construction. N-scale windows from Grandt Line were modified and installed.
IMG_emp_1123.JPG
168 viewsRed Bondo spot putty is used to fill some minor imperfections.
IMG_emp_1134.JPG
168 viewsA speaker will be installed in the roof to play tracks from the "Five Alarm" musical act that performs between the Emporium and Firehouse.
IMG_emp_1128.JPG
167 views
IMG_emp_1121.JPG
166 views.040" styrene pieces are installed to clean-up the appearance of the back of the Emporium.
IMG_emp_1127.JPG
166 viewsHere the overlay has been installed.
IMG_emp_1126.JPG
165 viewsTo allow the four windows in the overlay to be illuminated, an opening needed to be cut in the wall.
IMG_emp_1131.JPG
162 views
30 files on 1 page(s)